Aerial view of a modern apartment complex near Cricklewood Broadway, featuring brick buildings and surrounded by residential houses, roads, and nearby industrial facilities.

Stoll Square / 317 Cricklewood Broadway

Cricklewood, London

We supported the planning of both the original Stoll Square residential scheme and the revised Purpose-Built Student Accommodation (PBSA) at 317 Cricklewood Broadway with multidisciplinary technical services, spanning over five years of regeneration efforts.

BB Partnership Limited

PROJECT DESCRIPTION

Located on Cricklewood Broadway in the London Borough of Brent, this evolving mixed-use site marks a key regeneration opportunity. In 2021, planning permission was secured for Stoll Square – a £55m scheme comprising 239 homes and 8,000 sq ft of commercial space, spread across three residential blocks with green roofs, rain gardens, and basement car parking.

Create was appointed in 2019 to provide specialist support for the planning application, covering Acoustics, Air Quality, Flood Risk, and Geo-Environmental services. Working collaboratively with BB Partnership, and The Landscape Partnership, we helped secure approval from Brent Council in February 2021.

Following changes in site viability and evolving housing demands, the proposals were reconfigured as a Purpose-Built Student Accommodation (PBSA) development. The revised scheme – submitted by PPM Planning in 2024 and now approved – includes 826 student residences, enhanced commercial frontages, and generous public realm improvements including a new pocket park.

The student living community prioritises sustainability and wellbeing, with design features such as bio-solar roofs, air source heat pumps, MVHR systems, and blue roof drainage. It forms part of the wider Cricklewood masterplan, reinforcing local vibrancy while addressing urgent housing needs in North London.

Modern red-brick apartment buildings surround a landscaped courtyard with trees, walkways, and people on a clear day. Cars are parked along the street in the foreground.
BB Partnership Limited
A quiet residential street with parked cars, brick houses on the left, terraced homes on the right, and speed bumps on the road under a clear blue sky.
BB Partnership Limited
Aerial view of a modern apartment complex near Cricklewood Broadway, featuring brick buildings and surrounded by residential houses, roads, and nearby industrial facilities.
BB Partnership Limited
Two modern brick apartment buildings face each other across a landscaped courtyard with trees and benches at dusk; storefronts line the ground floors, and people walk along the street.
BB Partnership Limited
People sitting and talking at outdoor tables in a courtyard with red brick buildings, seen through large glass windows from a modern indoor lounge area.
BB Partnership Limited
A group of people sit and stand on the grass and pathways in a courtyard surrounded by multi-story brick buildings, with trees and shrubs scattered around.
BB Partnership Limited
A wide city street with cars parked and driving, lined with brick buildings and a gym, under a clear blue sky.
BB Partnership Limited
A person on a motorcycle rides across an intersection between two modern brick buildings under a clear blue sky.
BB Partnership Limited

WHAT WE DID:


PLANNING STAGE – ORIGINAL SCHEME 2019-21

  • Air Quality Assessment

Evaluated construction and operational air quality impacts in accordance with GLA and local guidance.

  • Noise Impact Assessment

Modelled likely noise levels from the site and surrounding environment to inform mitigation.

  • Flood Risk Assessment

Identified potential flood risks and proposed mitigation aligned with national policy.

  • Drainage Strategy

Developed a SuDS-led approach for surface water management.

  • Basement Impact Assessment

Reviewed potential structural and hydrological impacts of below-ground development.

  • Phase 1 Contaminated Land Assessment

Assessed potential risks from historical uses and informed remediation strategy.

  • Baseline Noise Monitoring

Deployed monitoring equipment to inform modelling and validation.

  • Detailed Noise Break-in Calculations

Confirmed indoor sound levels for residential units and amenity spaces.


PLANNING STAGE – REVISED SCHEME 2024-25

  • Air Quality Assessment

Reassessed air quality implications of the PBSA scheme, including demolition and operational phases.

  • Flood Risk Assessment

Reviewed the new national flood modelling to accommodate revised site layout and drainage proposals.

  • Drainage Strategy

Integrated blue roof drainage, permeable surfaces, and enhanced green infrastructure.

  • Noise Management Plan

Outlined operational and construction-phase controls to minimise acoustic impacts.

  • Construction Noise and Vibration Impact Assessment

Analysed potential disruption from demolition and foundation works.

  • Phase 1 Contaminated Land Assessment

Revalidated baseline risks following revised site layout.

  • Noise Impact Assessment

Evaluated cumulative noise levels from external plant and activity areas.

  • Baseline Noise Monitoring

Returned to site to capture further data for detailed modelling, helping to inform the revised design.

  • Detailed Noise Break-in Calculations

Remodelled internal noise levels within student bedrooms and shared amenity spaces, ensuring the new scheme complied with BS 8233.


DESIGN STAGE (TO BE CONFIRMED)


KEY ACHIEVEMENTS / BENEFITS

  • Two planning approvals secured

We helped secure approval for the original scheme on 11 February 2021, and the revised PBSA development on 4 August 2025.

  • Long-term understanding of the site and its constraints

Our five-year involvement provided continuity and deep insight into the site’s planning context, physical constraints, and evolving development needs.