Over the academic calendar of 2021-22 (September to August), we visited schools nationwide to carry out various technical requirements in support of Condition Improvement Fund (CIF) projects scheduled for the holiday period. These projects were managed by RAM Building Consultancy, to whom we were subcontracted. The scope and scale of work varied, requiring our team to operate within tight deadlines to deliver essential reports, surveys, inspections, and technical drawings on time, ensuring project completion before the start of the new school year.
The projects included:
- Design, selection, and installation of new plant including commissioning.
- Reviews of building structures including roofs and gables, etc.
- Investigation of ground conditions for future works.
- Reviews of drainage systems after flood events, toilet blockages, etc.
- Replacement hot and cold water services.
- Replacement of heating systems, installation of new gas boilers, etc.
- Reviews of existing Building Management Systems (BMS) including old underfloor pipes, etc.
The schools included:
- South Witham Academy, Grantham
- On-Site Survey
- Structural Condition Report
- Sir Harry Smith Community College, Peterborough
- Windows Audit
- Hope Hamilton, Leicester
- On-Site Survey
- Drainage Condition Report
- Technical Drawings and Layouts
- Roebuck Academy, Stevenage
- Heat Source Pump Audit
- IQRA Primary School, Slough
- On-Site Survey
- Drainage Condition Report
- Wednesbury Oak Academy, Tipton
- On-Site Survey
- Land Contamination Assessment
- Infiltration Testing
- Drainage Condition Report
- Pentland School, Uxbridge
- On-Site Survey
- Structural Condition Report
- Kanes Hill Academy, Southampton
- On-Site Survey
- Boiler & Heating Condition Report
- Drainage Condition Report
- Mechanical Services Performance Specification
- Rookery School, Birmingham
- Drainage Condition Technical Note
- Wilden Primary School, Wilden
- On-Site Survey
- Structural Condition Report
- Drainage Condition Report
- Ocker Hill Academy, Tipton
- On-Site Survey
- Heating Condition Report
- St Mary’s Catholic School, Rotherham
- On-Site Survey
- Boiler Condition Report
- Structural Report
- Middlestown Primary School, Wakefield
- On-Site Survey
- Boiler Condition Report
- Structural Condition Report
- Drainage Condition Report
- BMS Review